Overview
The Incheon Port International Passenger Terminal was established to resolve user inconveniences caused by dual (inland and coastal port) operations by constructing the Incheon Port International Passenger Terminal and Terminal, increase port operational efficiency, and develop Incheon Port into an international tourist destination. Construction began in December 2016, was completed in June 2019, and began operations on June 15, 2020. With a total floor area of 66,789.62㎡ (Terminal building 65,421.15㎡, Gate building 1,368.47㎡), the building consists of floors 1~5 above ground and a rooftop floor.